ORENX for Manufacturing
ORENX gives small factories and workshops a single platform to manage BOMs, work orders, raw materials, job work, and production costing. No more juggling Excel sheets, paper registers, and Tally.
Rs 2.4L
Average yearly savings on scrap reduction
70%
Less time on production paperwork
22
Document types for full traceability
4
Indian languages supported
Common pain points in manufacturing businesses that slow you down.
Work orders, material issues, and finished goods are all in separate registers. Nobody knows the real status of any production batch at any given time.
You know the raw material price, but what about labour, overheads, scrap, and job work charges? Most factories only find out their real cost after the order is delivered.
Cutting waste, defective pieces, and process losses add up to lakhs every year. Without tracking, you cannot reduce them.
Raw material purchases happen in Tally, production runs on paper, and sales invoices are in another system. Matching them is a monthly headache.
Materials sent to subcontractors for plating, heat treatment, or assembly are hard to track. You lose visibility the moment goods leave your godown.
You discover a raw material shortage only when the production line stops. No alerts, no reorder tracking, no way to plan ahead.
Purpose-built tools for manufacturing businesses.
Define BOMs with sub-assemblies, alternate materials, and scrap percentages. ORENX auto-calculates the total raw material needed for any production quantity.
Create work orders, track their status from planned to in-progress to completed, and record material consumption and finished goods output at each stage.
ORENX calculates the cost of every finished good by adding up raw materials (at weighted average cost), labour, overheads, and job work charges.
Issue materials to subcontractors with a document trail. Track what was sent, what was received back, and reconcile the difference. Link vendor invoices to each job.
See exactly how much of each raw material is in your godown, how much is on order, and how much is with job workers. Get alerts before you run out.
Track production trends, material consumption patterns, scrap rates, and job work costs over time. Spot problems early and make better purchasing decisions.
Define your product's BOM with all raw materials, quantities, and expected scrap. Add sub-assemblies if your product has multiple stages.
Create a work order for the required quantity. ORENX checks raw material availability and shows you what is short so you can raise purchase orders.
Issue raw materials from your godown to the shop floor. Stock gets deducted automatically, and the work order shows materials consumed.
If any process is outsourced, create a job work issue to send materials to the subcontractor. Track materials sent and expected delivery date.
When production is done, record finished goods and any scrap. ORENX calculates the production cost and adds finished goods to your inventory.
Create a delivery challan and sales invoice with GST. Track payment from the customer. The entire flow from raw material to collection is now in one place.
Create and manage multi-level BOMs with raw materials, sub-assemblies, and process steps. Define quality check parameters and material requirements for each product.
Plan, start, and complete work orders. Record raw material consumption, finished goods produced, and scrap generated. Convert sales orders directly into work orders.
Automatically compute the landed cost of finished goods using weighted average raw material cost, labour inputs, overheads, and subcontracting charges.
Issue materials to vendors, receive finished or semi-finished goods back, and track conversion costs. Common for plating, powder coating, heat treatment, and stitching work.
Record process waste and defective items against each work order. Track scrap rates over time to identify problem areas and reduce material loss.
Move raw materials, semi-finished goods, and finished goods between warehouses with a proper document trail. Every transfer updates stock in real time.
Generate sales invoices and delivery challans with correct CGST, SGST, or IGST. Export GSTR-1 and GSTR-3B reports directly from ORENX.
Define quality check parameters within your Bill of Materials. Record basic quality notes against each work order and production batch.
15-day free trial. No credit card needed.